In an energy audit for an electric motor, the measuring points should be set as the panel outgoing feeder that supplies the motor, the motor terminal box and, where possible, the shaft or driven machine side. The differences read between these three points separate cable loss, motor loss and how much work the machine really demands.
Why is a single measuring point not enough for an audit?
A single analyser reading in the panel gives the total consumption of motor, cable and machine. That figure does not show which item is large.
For example, when power on a pump line comes out high, the cause may be winding loss, a long feeder with a small cross-section, a throttled valve or a worn impeller. All four lead to the same kW reading. As measuring points multiply, these items are separated one by one and the list of recommendations stops being guesswork.
There is also a time dimension.
A five-minute measurement taken in the first hour of the morning shift shows nothing of a compressor running at half load all night. So point selection and recording time are planned together.
Which values are recorded at the panel outgoing feeder?
At the panel outgoing feeder three phase voltages, three phase currents, active power, reactive power, power factor and total harmonic distortion are recorded. This point is the reference for what the motor really draws from the supply.
The analyser's current clamps go on the cable to the motor, after the contactor or the drive input. Voltage leads are taken from the same point; voltage taken from another busbar mixes the cable drop into the measurement.
The recording interval is usually chosen between one and ten seconds and covers at least one full production cycle. For a batch mixer this is one batch, for a continuously running fan at least one full day, and for a line that stops at weekends one working week (general information; settle it with the engineer defining the audit scope).
What is measured in the motor terminal box?
In the terminal box the three phase voltages are measured with the motor running. The voltage difference between panel outgoing feeder and terminals shows the cable drop directly.
This is the step most often skipped in energy audits. On a long borehole line or an extractor at the far end of a plant, even a drop of a few percent strains the winding: as voltage falls, current rises to deliver the same shaft power, copper loss grows with the square of current and the frame runs hotter than expected. In the audit report this item is often wrongly written up as "inefficient motor"; in fact the problem lies not in the motor but in the line carrying energy to it.
Before the terminal cover is opened, the motor's rating plate is photographed. Whether the links are in star or delta and whether cable lugs show oxide or heat marks are also noted; a loose terminal screw causes resistance and unbalanced current on one phase.
As the measurement is made on a live circuit, an authorised electrician, suitable personal protective equipment and a meter of adequate category rating are essential.
What are the measuring points on the shaft and machine side?
On the shaft side speed, frame temperature and vibration are measured; on the machine side, the process values that show the work the machine does. For pumps these are mainly flow and head, for fans air volume and static pressure, for compressors discharge pressure and the loaded/unloaded time ratio.
Speed is read with an optical tachometer from reflective tape stuck on the shaft. Deviation from rated speed gives a rough idea of the motor's load ratio: at no load it approaches synchronous speed, at full load it drops to plate speed.
Frame temperature is taken with a non-contact thermometer or thermal camera, from the same spot on the motor and under the same load condition. The bearing housing area and the middle of the frame are recorded separately.
An audit without process values can state the motor's efficiency but not the system's efficiency. On a pump running against a throttled valve, the biggest loss is not in the motor but in the valve.