The information needed when requesting a quote for an electric motor falls into five groups: supply (voltage, frequency, starting method), mechanical interface (mounting type, IEC frame number, shaft end), nature of the load (power or torque, speed, starting difficulty), environment and duty, and finally quantity and required documents. If each of these five groups is filled in, the supplier can propose a single model; if one is missing, the reply usually comes back as a list of questions. The selection form below is explained field by field so that purchasing and maintenance speak the same language.
Which missing details slow down a quotation?
The most common request seen in practice consists of only one sentence: “We need a 22 kW motor.” That sentence covers three different 2, 4 and 6-pole models, several foot or flange mounting arrangements and two different voltage connections at once. The supplier either asks about every possibility one by one or assumes the most common option; in the second case there is a risk of the wrong motor arriving on site.
The second frequent gap is a missing speed. At the same power, a 1000 rpm motor delivers roughly three times the torque of a 3000 rpm one; the belt ratio or gearbox on the machine cannot absorb that difference. The third gap is the mounting arrangement: if a B5 flange motor arrives in place of a B3 foot-mounted motor, it cannot be fitted to the machine.
How is the electrical supply written on a quotation form?
The supply section states the mains voltage, frequency and starting method. The first line of the form is the site supply voltage. Depending on the model, the winding of our series motors is 230/400 V or 400/690 V; on a 400 V site a 230/400 V winding runs in star and a 400/690 V winding runs in delta. This difference directly affects the starting method: star-delta starting requires the motor to be able to run in delta at supply voltage, which is why a 400/690 V winding is preferred at larger ratings.
How the motor is to be started is a separate line too: direct on line, with a star-delta contactor set, with a soft starter or through a frequency converter. Converter operation needs extra information. Our three-phase series are suitable for speed control with a frequency converter; for long periods at low speed with full torque, a separate fan may be required; if the drive-to-motor cable is long, a dv/dt or sine filter is considered; these conditions are stated in the order.
The form should therefore include lines for speed range and cable length.
The standard frequency is 50 Hz. If a different supply frequency is involved, this is optional; speed, current and torque differ slightly from 50 Hz, so please state it in the order.
What does the form need for the mechanical interface?
The mechanical section lists mounting type, IEC frame number and shaft end. Mounting arrangements B3, B5, B14, B34, B35 and vertical V1/V3/V5/V6/V15 are offered according to frame size; the flange size is confirmed in the order. For vertical mounting, whether the shaft end faces the ceiling or the floor must be written separately, because the bearing arrangement and the protection against water entry change accordingly. Writing “same as the existing motor” on the form is not enough; the mounting type used must be stated clearly.
The IEC frame number is the first piece of information for compatibility; exact compatibility is confirmed by comparing mounting type, shaft diameter and length, foot hole spacing, flange and electrical values. For the numerical values of these dimensions, the HEM Motor 2026 catalogue can be used; on the form, the name of the coupling, pulley or gearbox input type on the machine side should be written.
How is the power requirement of the load shown in figures?
If the power is unknown, it can be calculated from the machine's shaft torque and speed: P (kW) = T (Nm) × n (rpm) / 9550. If there is a gearbox or belt in between, the output requirement is carried to the motor shaft by dividing by the transmission efficiency. This calculation is general knowledge; confirm it with the machine manufacturer's data.
Hypothetical example: a belt conveyor needs 1300 Nm of torque and 48 rpm at the gearbox output. Shaft power is 1300 × 48 / 9550 ≈ 6.5 kW; assuming a gearbox efficiency of 0.92, the requirement at the motor shaft is about 7.1 kW. In the standard power steps, the 7.5 kW 4-pole motor just above this carries the load. Writing the calculation itself on the form, that is torque, speed and efficiency, lets the supplier check the selection.
Starting difficulty is a separate line. A fan that starts unloaded and a mixer that starts full need different motor behaviour at the same rated power. Adding a note such as “starts under load”, “high inertia” or “frequent start-stop” makes it easier for the supplier to decide whether to upsize the motor.