The installation method directly changes the current an electric motor supply cable can carry, because it determines how easily the cable can shed the heat it produces: a cable of the same cross-section runs comfortably on a perforated tray in free air, yet carries noticeably less current in a conduit inside a thermally insulated wall or in a crowded trunking. That is why the cross-section is chosen not from the motor current but from the current-carrying capacity corrected for the installation method.
Why does a cable carry a different current depending on where it is laid?
Current flowing through the conductor produces heat, and the permitted conductor temperature of the cable is fixed by its insulation material. PVC and XLPE insulation have different limits; but in both cases what decides is how quickly the heat produced is carried away.
A cable hanging in open air, a little away from the wall, gives off heat in every direction. Conduit is another matter. Inside a conduit or a closed trunking, air movement is restricted and the heat has to pass first to the conduit wall and then to the surroundings. A buried cable spreads its heat according to the thermal resistivity of the soil; in dry sandy ground it cools less easily than in moist clay (general information; confirm with the cable manufacturer's catalogue).
The difference is not small.
That is why cable manufacturers' current tables are not a single column but several columns split by installation method. IEC 60364-5-52 defines these methods with letter codes: conduit in a thermally insulated wall, conduit on a wall, clipped direct to a wall, perforated tray, ladder tray, direct burial and so on. Whatever letter the design calculation used, the installation on site must match it.
Which installation methods reduce current-carrying capacity the most?
The largest reductions come from installations that trap heat.
Conduit running inside a thermally insulated panel, closed metal trunking exposed to the sun, and routes where many circuits are squeezed into the same conduit or tray belong to this group. The table below is a qualitative ranking; for numerical factors use the tables of the cable manufacturer and the standard.
Installation method
Ease of heat dissipation
Point to watch on site
Conduit inside a thermally insulated wall or panel
Weakest
Common in cold rooms and sandwich-panel buildings; design and site may not match
Conduit or closed trunking on a wall
Weak
Capacity drops further as trunking fill increases
Clipped direct to a wall
Medium
Whether spacing has been left between adjacent cables
Direct burial or underground duct
Depends on soil thermal resistivity
Backfill material, depth and other cables nearby
Perforated or ladder tray, in free air
Easiest
The advantage is lost if trays are stacked on top of each other
The most common mismatch on site is this: the design was calculated assuming perforated tray, but during installation the cables were moved into closed galvanised trunking or routed through a sandwich panel for one section. The section where the cable cools worst, even if only a few metres long, sets the capacity of the whole run. A chain is only as strong as its weakest link.
How do grouping and ambient temperature enter the calculation?
Every loaded circuit running side by side in the same tray or conduit also carries its neighbour's heat; that is why the grouping factor gets smaller as the number of circuits rises. If the ambient temperature is above the reference value of the table, a second derating factor is applied.
The calculation takes the form of a product:
Iz = Itable × kmethod × kgroup × ktemp (× ksoil)
Here Itable is the current given by the cable manufacturer for the chosen installation method, and the k values are correction factors read from standard or catalogue tables. The condition is that the corrected capacity exceeds the setting current of the protective device, which in turn exceeds the motor's operating current (general information; designed by the plant's electrical engineer).
Hypothetical example: same cable, two routes
Call the current a cable's manufacturer table gives for perforated tray 100 units. If six loaded circuits run side by side in the same tray, take a grouping factor of 0.75 as an example, and because the ambient is hot under a boiler-room ceiling, a temperature factor of 0.9 as an example. The corrected capacity becomes 100 × 0.75 × 0.9 ≈ 67 units.
If part of the route passes through a thermally insulated panel in conduit, the relevant column of the table is read separately for that section and the result drops further. The factors here were chosen only to show the method; real values come from the standard and the cable catalogue. This calculation is enough to see that the same cable can be adequate on one route and inadequate on another.
Even if the motor on site stays the same, the route the cable follows sets its current-carrying capacity (representative image).
Prices and technical data are on the product pages; choose a model and order online.
What information is collected for the cross-section calculation of a motor feeder?
A complete information list should reach the desk of the engineer who will calculate the cross-section; installation method is the most frequently skipped line on that list. On the motor side, nameplate current and starting method are needed; on the cable side, every section of the route.
Rated current, voltage and connection (Y or Δ) from the motor nameplate; with Y/Δ starting, state separately that two cables go to the motor and each carries phase current.
Starting method and starting time: direct-on-line, Y/Δ, soft starter or drive (frequency converter).
For each section of the route: installation method, section length and the number of circuits running side by side in that section.
Ambient temperature in the hottest section; areas under the roof and near furnaces in summer are noted separately.
For the underground section: depth, backfill material and thermal resistivity data if available.
Total run length; voltage drop is a separate check independent of current-carrying capacity, and on long runs it often decides the cross-section.
With this information the engineer checks voltage drop first, then corrected current-carrying capacity, and finally coordination with the protective device.
Selecting fuse, breaker and cross-section values under the regulations is the responsibility of the electrical engineer who signs the design. Our article on overload relays and fuses, which explains the choice of protective device in detail, completes the picture when read together with the cable calculation. On site, the place where this list gets filled in is often the route sketch left with the installation team; if there is no sketch, climbing above the ceiling and measuring section by section with a tape saves surprises later. Opening the trunking covers and counting the circuits inside is done on the same round. If you note how many cables in a trunking are loaded and how many are spare or signal cables, the grouping factor can be chosen realistically.
How is an installation error noticed on site?
The most reliable sign is that one section of the cable is clearly hotter than the rest under load. Walking along the tray and trunking at full load with a thermal camera shows the problem section within minutes. A scan at no load is misleading.
Hardened or discoloured insulation is also a clue. Hot air hitting your face when you open a trunking cover, and an overload relay on the same motor that trips in summer but not in winter, point the same way. A high lug temperature at the cable ends, on the other hand, may come from connection resistance rather than installation; to tell the two apart, check on the thermal image whether the heat is spread along the cable or concentrated only at the end.
When a new motor is added to an existing plant, the fill of the old cable tray changes too. The new circuit reduces the grouping factor of the existing circuits; in other words, the capacity of the old cables in the tray where the addition is made must also be rechecked. If the power step rises along with a replaced motor, you can see current models with their current values in the electric motor shop.
How are the motor data for the cable calculation read on specific models?
The current needed for the cable calculation is given for 400 V on the motor nameplate and product page. Three examples from different power steps:
80M2-4: cast iron, 0.75 kW, 1420 rpm, 230/400 V, 1.75 A at 400 V; on long runs voltage drop often decides the cross-section.
100L2-4: cast iron, 3 kW, 1450 rpm, 230/400 V, 6.02 A at 400 V; connected in Y on a 400 V network and fed by direct-on-line starting.
180L-4: cast iron, 22 kW, 1470 rpm, 400/690 V, 39.7 A at 400 V; Y/Δ starting needs two separate supply cables and a grouping calculation.
The series comes with IP55 protection, class F insulation and CE marking; IE3, IE4 and IE5 efficiency classes are offered, and the class for each model is confirmed with the order. The side from which the cable enters the motor can change the route; for terminal box position and frame dimensions see the technical drawings page. Power tables across the family are on the asynchronous electric motors page.
If the motor's nameplate current or starting method is not yet clear for the cable calculation, photograph the nameplate of the motor you have and share it with the planned starting arrangement through our contact page; we will prepare the current and connection data of the selected model in a form ready to pass to your design engineer. All power steps are in the HEM Motor product list.
Frequently Asked Questions
Is it enough to choose the cable cross-section from the motor nameplate current?
It is not. Nameplate current is the starting point; the electrical engineer decides the cross-section after installation method, grouping, ambient temperature and voltage drop have been taken into account.
Does the calculation change if only a short section of the cable is in conduit?
It does. The section where the cable cools worst, even if short, limits the current-carrying capacity of the whole run.
What else is checked besides installation method on a motor fed by a frequency converter?
Whether the converter output cable is screened, whether the screen is earthed at both ends, and the cable length are assessed separately. Long cables may need a dv/dt or sine filter; this is stated with the order.
Does adding a new motor cable to an existing tray affect the old cables?
Yes, because the grouping factor gets smaller as the number of circuits rises. Before adding, the capacity of the existing circuits in the tray must also be rechecked.
HEM Motor Models Related to This Article
The cards show example models related to the topic. A suitable motor is not chosen by power alone: compare speed, voltage, mounting, shaft and connection dimensions on the product page; if unsure, send a photo of the existing motor’s nameplate on WhatsApp.
Checking that electric motor pulleys lie in the same plane means seeing whether the side faces of both pulleys meet on one straight line. In practice a taut string, a steel straigh... More Details
If an electric motor's coupling element fails often, the first thing to investigate is shaft misalignment, followed by coupling selection, starting and shock loads, environmental e... More Details
The quickest way to tell foundation looseness from unbalance in electric motor vibration is to loosen the foot bolts one at a time while measuring and watch the change, and to comp... More Details
When building a sound enclosure around an electric motor, cooling is preserved by giving the enclosure a labyrinth or silenced inlet large enough for the air the motor fan draws, p... More Details
In an electric motor running in a hot environment, winding and bearing temperatures are monitored separately because they heat up from different sources, have different limits and ... More Details
When an electric motor is started for the first time at sub-zero temperatures, three things need checking: winding insulation resistance and any moisture or ice inside, bearing gre... More Details