When an electric motor comes back from the workshop with a new winding, new bearings or a repaired frame, it should pass four measurements before it is fitted to the machine: insulation resistance, phase winding resistance balance, no-load current, and vibration together with bearing temperature. Placed side by side with the values in the workshop's handover report, these readings show on site, before any load is applied, whether the repair has really been completed. If acceptance testing is skipped, the fault usually appears during the first shift, with the machine loaded and at a far more expensive moment.
Which values should the workshop report contain?
The first step of acceptance is not a meter but a sheet of paper. After a rewind or overhaul, the workshop report should include at least the following: phase resistances before and after rewinding with the measuring temperature, the insulation test voltage applied and the value read, the surge test result if one was done, the type of bearings fitted, and the no-load trial current.
If the report does not state that the wire cross-section, coil pitch and number of turns were kept the same as the old winding, ask about it. An electric motor whose turn count has changed by a few turns runs normally at first glance. But its no-load current and heating will be different.
The nameplate values (kW, voltage, connection, speed) must remain legible on the motor. If the plate has been lost, ask the workshop for a re-engraved one.
What should be checked by eye and by hand before measuring?
Before taking any readings, put the motor on the bench and turn the shaft by hand. It should rotate without catching, without rubbing noises and without a noticeable increase in axial play. Look for broken fan blades, a dented fan cover and a torn terminal box gasket. Check that the terminal links are in place and their nuts are tight.
Rust that has been painted over rather than cleaned, missing or mismatched bolts on the end shields, and impact marks on the shaft end are signs that deserve attention. The keyway and key must be sound; if an old coupling half was pulled off in the workshop, make sure the shaft was not damaged during pulling.
How do you read insulation resistance and the polarization index?
Insulation resistance is measured with an insulation tester (megger) that applies DC voltage between the winding and the frame. For low-voltage motors, a test voltage of 500 V or 1000 V DC is commonly used on site. Which one to choose depends on the motor's rated voltage and the instrument manufacturer's instructions. Before testing, the motor is isolated from the supply, the cables are removed from the terminals, and when the test is finished the winding is discharged by earthing it.
A time-based reading says more than a single value. The polarization index (PI) is the ratio of the resistance at the 10th minute to the resistance at the 1st minute:
PI = R(10 min) / R(1 min)
In a dry, clean winding the resistance rises clearly over time. In a damp or dirty winding the curve stays flat. On site, a PI below 2 is usually taken as a sign of moisture or contamination (general information; confirm with the instrument manufacturer's instructions). Because insulation resistance changes strongly with temperature, always note the measuring temperature. The same motor gives a different result straight from a cold store than on a warm bench.
How is phase winding resistance balance measured?
The resistance of the three phase windings is measured with a micro-ohmmeter of milliohm resolution or an instrument using four-wire (Kelvin) measurement. The terminal links are removed and each phase is read at its own leads. A simple multimeter gives an idea on small motors, but on large frames the winding resistance is so low that it falls short.
The imbalance is calculated as follows:
Imbalance (%) = (largest deviation / average of the three phases) × 100
Take a hypothetical example. 0.412 Ω, 0.418 Ω and 0.409 Ω were read on phases U, V and W. The average is 0.413 Ω and the largest deviation from the average is 0.005 Ω; the imbalance comes out at about 1.2%. If this value agrees with the workshop's own measurement it is a good sign.
If one phase stands clearly apart, look for a loose connection, a faulty brazed joint or a difference in turns.
Since resistance varies with temperature, reduce both readings to the same reference temperature before comparing them with the workshop value. The general formula for copper is R₂ = R₁ × (235 + t₂) / (235 + t₁) (general information; confirm with the instrument instructions).

How are current, noise and temperature monitored in the no-load trial run?
If the electrical measurements are clean, the motor is run uncoupled at rated voltage and with the connection on the nameplate (Δ or Y). The no-load current of all three phases is read with a clamp meter. The current difference between phases usually looks larger than the winding resistance imbalance, because it also carries the supply voltage imbalance. So measure the phase-to-phase voltages at the same time.
The ratio of no-load current to rated current varies with the motor's number of poles and power; it is higher in small and multi-pole motors. Instead of a fixed threshold, compare with the same motor's no-load current before rewinding or with the value in the workshop report. A no-load current clearly higher than before suggests that the number of turns has been reduced or that there is a problem in the air gap.
While the trial runs for 15–30 minutes, the bearing housings are monitored by hand and with a non-contact thermometer. The temperature should rise smoothly and then settle. A bearing temperature that keeps climbing points to the wrong amount of grease, a tight fit or an end shield fitted out of line.